This week I took my plane in for annual and got the inspection report back this morning. I wasn't expecting anything major since at this point my plane is like new, however there is always something. It came back just rosy, although they have yet to complete the spar web inspection so I'm fingers crossed on that one. Here is the report:
Compressions X/80
Left: 68 64 62 70 72 70
Right: 62 72 64 64 72 70
Mag Timing: Seems to have slipped a bit, adjust back down to 20deg
Change oil/filter
Service spark plugs
Small injector line bracket needs to be replaced
Some chaffing, install a few clamps on fuel lines
Fuel injector nozzles - clean fuel nozzles
Check and clean fuel metering valve screens
Left cowl flap actuator chaffing breathing tube need to secure it
Left main landing gear strut - service struts
That's basically it. There is also a small hole in one of the airboxes. The 35 year old aluminum just doesn't hold up forever however mine are still in decent shape. Cygnet makes a replacement unit but I'm not sure about pricing, they do look gorgeous though!
For now I think I'll keep what I've got.
Tuesday, October 1, 2013
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment